Who Pulls the Permit—and What Happens Next?

Oct 10
3 min read

If your remodel needs a permit, one of the most important early questions is who is responsible for obtaining it.

California’s Contractors State License Board says a home-improvement contract should include written direction about who will obtain necessary permits. That means permit responsibility should not be left to a verbal assumption.

The next questions are just as important: Does the project require plan review? Which inspections apply? Who schedules them? What documents should the homeowner keep? What happens if the scope changes after work begins?


Put Permit Responsibility in Writing

Before signing, clarify whether the contractor or homeowner is obtaining the permit, which permit or approval is expected, whether fees are included, who responds to corrections or agency questions, and who coordinates required inspections.

The point is not that one arrangement is universal. The point is that responsibility should be explicit.


Permit, Plan Check, and Inspection Are Different Steps

Permit

A permit is the authorization for specific regulated work.

Plan Check

Plan check is the review of submitted plans when the project or jurisdiction requires that review. Not every project follows the same plan-check pathway.

Inspection

Inspections occur at required stages of permitted construction. LADBS’s published building-permit process shows plan review, permit issuance, construction, and inspection as distinct stages for applicable projects. The exact inspection sequence depends on the permitted scope.


What Should Happen Before Work Is Covered Up?

For permitted work, homeowners should understand whether an inspection is required before the next construction layer hides the work.

  • Which inspections apply to this scope?

  • Who schedules them?

  • What work must remain visible?

  • What happens if corrections are requested?

  • What documentation should the homeowner retain?

This is especially important when plumbing, electrical, mechanical, framing, waterproofing, or other work may become inaccessible later in the project.


What If the Scope Changes?

Remodeling projects sometimes change after work starts. California CSLB guidance says changes to the contract should be documented in writing. If the contract price or scope changes, the change should be handled through a written change order before the changed work proceeds.

  • What work is being added, removed, or changed?

  • How does the contract price change?

  • Does the schedule change?

  • Do materials or allowances change?

  • Does the change affect the permitted scope?

A scope change can create more than a pricing question. If it affects permitted work, the project team may need to determine whether plans, permits, or approvals also need to be updated.


Keep a Simple Project Record

  • The signed contract

  • Permit information

  • Approved plans when applicable

  • Written change orders

  • Inspection or correction documentation when provided

  • Warranties and final project records


Questions to Ask Before Work Begins

  1. Who will obtain the necessary permit?

  2. Which building department has jurisdiction?

  3. Does this scope require plans or plan check?

  4. Which inspections are expected?

  5. Who schedules inspections?

  6. What must remain visible until inspection?

  7. How are corrections handled?

  8. How will scope, price, or schedule changes be documented?

  9. Could a change require an update to the permitted scope?


The Bottom Line

A permit is not one administrative checkbox. For many projects, the process is better understood as responsibility, review when required, permit, work, required inspections, and documented changes when needed.

Construction Concern has served Southern California homeowners since 1983. If you are planning a remodel, ask us what permit and process questions should be clarified before work begins.